The construction of the new control tower at Toussaint Louverture International Airport is making progress. The metallic structure that will house the control room is taking shape, and the construction of the technical building is advancing rapidly. The air traffic control radar is already available and has been successfully tested. On Wednesday, December 12, a delegation from the Inter-American Development Bank (IDB) visited the airport to assess the progress of the construction. The delegation was accompanied by Laurent Joseph Dumas, the D
Si vous avez déjà créé un compte, connectez-vous pour lire la suite de cet article.
Pas encore de compte ? Inscrivez-vous