According to the governor of the Central Bank, Charles Castel, the building of 6,000 square meters has been built to the highest seismic and hurricane standards, revised after the tragedy of 2010. Its concrete structure is based on more than 360 steel piles, and its design is the result of hard work of a team of architects and seasoned engineers who coordinated each step leading to the realization of this long adventure, from design to construction supervision.
This conference center, said Castel, propels the bank to the size of other central b